Certificate for the management system according to ДСТУ ISO 9001:2009 №UA2.171.09129-15

Works carried out by the experts of the Department in recent years

 

Object, country

Subject of a Contract

Customer

Year of maintaining

1. TPP Automation Systems​

1.1

Moldovian TPP,

Republica Moldova
Development of the project of instrumentation and control system for units 11,12. EMV technologies 2018-2019
1.2

Moldovian TPP,

Republica Moldova
Implementation of the project of boiler lighting protections and interlocks. Energy-ORGRES,
Bulgaria
2018-2019
1.3

Kharkiv TPP-5,

Ukraine
Development of the project of the feedwater pumps frequency regulating. Kharkiv TPP-5 2018
1.4

Kharkiv TPP-5,

Ukraine
Development of the project and commissioning of the turbine 2 microprocessor based remote control systems. Kharkiv TPP-5 2018
1.5

Pridneprov TPP,

Ukraine
Design and implementation coordinated control of boiler power regulator and new fuel coal preparatory control system. Emerson 2018
1.6

Cherkasy TPP,

Ukraine
Development of the project of boilers 1…4 control systems. Ukratomproject 2018
1.7

Pridneprov TPP,

Ukraine
Development, supply ,mounting and commission of the instrumentation and control systems for new equipment due to modernization of technological equipment. Dniproenergo 2018-2019
1.8

Kharkiv TPP-5,

Ukraine
Development, design and implementation of the new Turbine digital electro-hydraulic system project based on TREI GmbH company platform for the power unit 100 MW No2 LLC  Ukrproectenergomontaj Ukraine 2017
1.9 Zmiyiv TPP, Ukraine Development, design and implementation of the DCS project based on TREI GmbH company platform for calculation of technical and economic indicators and registration of emergency events at power units 200 MW No1-6 Central Electricity Company,
Ukraine
2017
1.10 Zmiyiv TPP, Ukraine Development, design and implementation of the DCS project based on TREI GmbH company platform for new systems for the supply and combustion of gas-fired coal in the furnace of the boiler for the power units 200 MW No2, 5. Central Electricity Company,
Ukraine
2017
1.11

Moldovian TPP,

Moldova

Implementation of I&C systems project based on TREI GmbH company platform for the power unit 200 MW No 10

Moldovian TPP,
Moldova

2017
1.12

Kharkiv TPP-5,

Ukraine

Detail project development for reconstruction of turbine controllers, technological protection, protective inflammatory devices of a power unit No2 based on TREI GmbH company platform, and “Fireye” company platform.

LLC Ukrproectenergomontaj,
Ukraine

2016

1.13

Burshtyn TPP, Zaporizhzhya TPP,

Ukraine

Development and implementation of the monitoring system project for the units 1-12 Burshtyn TPP, units 1-4, 6 Zaporizhzhya TPP..

DTEC “Zahidenergo”,
"Dniproenergo",
Ukraine

2016-2017

1.14

Lviv TPP-1,

Ukraine

The development, design, assembly and supply of the equipment, installation and commissioning of boiler No7,6, microprocessors regulators based on Westron (Kharkiv, Ukraine) company platform.

Lvivteploenergo,
Ukraine

2016-2017

1.15

Zaporizhzhya TPP, units №1,3;

Ugliegorsk TPP, units №1,3,4;

Kharkiv TPP-5, units №1,3;

Trypillya TPP, unit №2,

Ukraine

Testing of power units to verify their primary and secondary regulation in accordance with ENTSO-E standards.

National Energy Company “Ukrenergo”,
Chehpol,
Ukraine

2015

1.16

Ugliegorsk TPP,

Ukraine

Development, design, assembling and delivery of controller cabinets, installation, and commissioning I&C systems of 300 MW coal fired power units №1, 3, 4, 2 based on TREI GmbH company platform.

Central electricity company

May-October
2013 (unit 1),

November 
2013 (unit 4),

 March 
2014 (unit 3),

September
2015 (unit 2)

1.17

Ladyzhin TPP,

Ukraine

The development and implementation of a complex computer simulator of 300MW power unit.

JSC “Zahidenergo”

2013-2014

1.18

Moldovian TPP,

Ukraine

Development reconstruction project of  I&C system of a power unit № 10.

Moldovian TPP

2013

1.19

Moldovian TPP,

Ukraine

Development the project of the boiler monitoring system of power units №№ 9, 10, 11, 12.

Moldovian TPP

2013

1.20

Burshtyn TPP,

Ukraine

The development of detail project for reconstruction of I&C system of a power unit № 5 based on ABB company platform.

ABB

2013

1.21

Dobrotvir TPP,

Ukraine

The development of project documents and commissioning of I&C system of a power unit № 8 based on Emerson company platform.

Emerson

2013

1.22

Zaporizhzhya TPP,

Ukraine

Development, design, assembly and supply of equipment, installation and commissioning I&C system of 300 MW coal fired power unit №1 based on TREI GmbH company platform.

JSC “Dniproenergo”

2011-2012

1.23

Moldovian TPP,

Moldova

Development, design, assembly and supply of equipment, installation, and commissioning of digital   control systems, DEH and protection systems of 200 MW gas fired  power unit №9 based on TREI GmbH company platform.

Moldovian TPP

2011

1.24

Pridnieprovska TPP,

Ukraine

Development, design, assembly and supply of equipment, installation, and commissioning of digital control systems of 150 MW power unit №9 based on TREI platform.

JSC “Dniproenergo”

2010-2012

1.25

Burshtyn TPP,
Ukraine

The development and implementation of a complex computer simulator of 200MW power unit.

JSC “Zahidenergo”

2010-2012

1.26

Lugansk TPP,

Ukraine

The development and implementation of a complex computer simulator of 200MW power unit.

JSC “Vostokenergo”

2010-2011

1.27

Moldovian TPP,

Moldova

The development and implementation of a complex computer simulator of 200 MW power unit.

Moldovian TPP

2010-2011

1.28

National Energy Company “Ukrenergo”

The evaluation  of power and frequency regulation state of UES of Ukraine.

National Energy Company “Ukrenergo”

2010

1.29

Kryvorizhska TPP,
Ukraine

Development, design, assembly and supply of equipment, installation, and commissioning of digital   control systems, DEH and protection systems of 300 MW coal fired  power unit №3 based on TREI GmbH company platform.

JSC “Dniproenergo”

2009-2012

1.30

Kurahovo TPP,
Ukraine

The development and implementation of a complex computer simulator of 200MW power unit for operators training.

JSC “Vostokenergo”

2009-2010

1.31

National Energy Company “Ukrenergo”

The development of  draft   for power and frequency regulation systems
of the United Electricity System (UES) of Ukraine.

National Energy Company “Ukrenergo”

2009-2010

1.32

Burshtyn TPP,
Ukraine

The development, design, assembly and supply of equipment, installation, and commissioning of I&C system  of 200 MW power unit .№ 7   based on TREI platform.

JSC “Zahidenergo”

2007-2010

1.33

Moldovian TPP,
Moldova

Development, design, assembly and supply of equipment, installation, commissioning of boilers digital control systems for combined cycle power units №11, 12  based on TREI equipment.

Moldovian TPP

2006-2008

1.34

“South Baghdad’ TPP

Iraq

The development, installation, and commissioning of full-scale I&C systems (including turbine DEH systems) of two 50 MW power units based on a controller platform Vulkan M (“Westron”, Ukraine).

Inter-energoservice,
Russia

2006-2008

1.35

Burshtyn TPP,

Ukraine

The development, design, assembly and supply of equipment, installation, and commissioning of I&C system (including DEH) of 200 MW power unit № 9   based on TREI platform.

JSC “Zayidenergo”

2005-2006

1.36

Minsk TPP-5,
Byelorussia

The software development, participation in hardware design, commissioning and maintenance assessment  of a full scale microprocessor I&C system of 330 MW power unit № 1 based on MAUS platform (plant named after T. Shevchenko, Ukraine).

Minskenergo

1999-2011

2. NPP Automation Systems

2.1 Zaporojskaia NPP, Ukraine Testing of the possibility of unit participation in grid primary frequency regulation Energoatom 2018 -2019
2.2 NPP “Kozloduy”, Bulgaria Development of technical solutions for improving operational modes of the 5,6 RY10 та 0,1,2 RY 30 systems of first loop water purification NPP “Kozloduy” 2017
2.3 NPP “Kozloduy”, Bulgaria Modernization of I&C system for the first loop water purification No3 NPP “Kozloduy” EAD NPP “Kozloduy” 2014-2017

2.4

NPP “Kozloduy”,

Bulgaria

Functional design, plant model adaptation, an open and closed loop testing and implementation of heating   and cooling-down system of new chamber type high-pressure heaters based on OVATION platform.

NPP “Kozloduy”

2013-2017

2.5

National nuclear Energy company “Energoatom”,

Ukraine

The investigation of a possibility of power plants PWR-440 and  PWR-1000 participation in a primary frequency regulation.

National nuclear Energy company “Energoatom”

2010

2.6

National nuclear Energy company “Energoatom”,

Ukraine

The development of the conception of I&C systems of units 3, 4 at Khmelnitskaya NPP (together with Kharkiv Complex Automation Institute).

National nuclear Energy company “Energoatom”

2010

2.7

NPP “Kozloduy”,

Bulgaria

The verification in a closed loop with a plant  model, and commissioning of safety systems regulators based on the equipment of ”Radiy” stock company.

 “Radiy” stock company, Ukraine

2008-2010

2.8

Armenian NPP,
Armenia

The software development, verification in an open and closed loops, and  commissioning of  steam generators of feedwater regulation system based on “Vulkan” controllers  platform (Westron, Ukraine).

Ltd. Westron, Ukraine

(TACIS program)

2006-2007

2.9

South-Ukrainian NPP,
unit. 3,
Ukraine

The software development, the verification in an open and closed loops, and commissioning  of steam generators feedwater regulation system and turbodriven feedwater pumps productivity regulation system based on “Vulkan” controllers platform (Westron, Ukraine).

Ltd.  Westron,
Ukraine

2006-2007

2.10

South-Ukrainian NPP,
units 1, 2,
Ukraine

The software  development, the verification in open and closed loops and commissioning  of safety systems regulators based on “Vulkan-M” controllers platform (Westron, Ukraine).

Ltd.  Westron,
Ukraine

2006-2007

2.11

South-Ukrainian NPP,
Unit 1,

Bulgaria

The verification in a closed loop, and commissioning of the reactor power and  reactor power limit regulator and reactor preliminary protection based on “Radiy” platform.

“Radiy” stock company,

Ukraine

2005

2.12

NPP “Kozloduy”, bl. 5, 6,

Bulgaria

The verification in an open and closed loops (with a plant model), and commissioning of regulation systems of the first loop based on OVATION platform.

WESTINGHOUSE

USA

2004-2006

2.13

Rivne NPP, unit 4,

Ukraine

The software development and commissioning of first, secondary loops and safety systems regulators based on M2002 controllers platform (manufacturer named after T. Shevchenko, Ukraine).

National nuclear Energy company “Energoatom”

2003-2004

2.14

Rivne NPP, unit 4,

Ukraine

The verification in a closed loop, and commissioning of the reactor power and  reactor power limit regulator and reactor preliminary protection based on “Radiy” platform.

National nuclear Energy company “Energoatom”

2003-2004

2.15

Zaporizhzhya NPP,

Ukraine

The software development, software verification in an open and closed loops, commissioning of  secondary loop control systems-ASUT-1000M and M2002 (Kharkov controllers manufacture, Ukraine).

National nuclear Energy company “Energoatom”

2002-2008

2.16

NPP “Kozloduy”, bl. 5, 6,

Bulgaria

Software functional design, the verification in an open and closed loops (with a plant model), and commissioning of the second loop regulation systems and digital electro –hydraulic system (DEH) based on OVATION platform.

WESTINGHOUSE

USA

2002-2005

2.17

South-Ukrainian NPP,
bl. 1,2,

Ukraine

Software functional design, the verification in an open and closed loops, and commissioning  of steam generators feedwater regulation system and turbodriven feedwater pumps productivity regulation system based on WDPF platform.

WESTINGHOUSE ENERGY EUROPE

(TACIS program)

1999-2003

News
1. An automatic general air control system with blast fan clutch on power unit № 2 of Kharkiv CHP-5 has been introduced
2. The expansion of the monitoring system at units 11 and 12 of Burshtyn TPP has been completed
3. Replacement of cable connections to the fittings of power units 1-4 o...
1 Implementation of the power unit control system № 2 Zaporizhzhya TPP
2 Supply of equipment for monitoring systems of power units № 11 and 12 of Burshtyn TPP
3 Service of PTC CCM units № 9 Burshtyn TPP and Prydniprovska TPP
1 The project of SAR of the turbine of block № 7 of Burshtyn TPP is developed
2 Service of PTC CCM unit № 9 of Prydniprovska TPP was carried out
3 Supply of equipment for SARCHP units № 2 and №4 of Zaporizhzhya TPP