1. An automatic general air control system with blast fan clutch on power unit № 2 of Kharkiv CHP-5 has been introduced
2. The expansion of the monitoring system at units 11 and 12 of Burshtyn TPP has been completed
3. Replacement of cable connections to the fittings of power units 1-4 o...
Works carried out by the experts of the Department in recent years
№ | Object, country | Subject of a Contract | Customer | Year of maintaining |
---|---|---|---|---|
1. TPP Automation Systems | ||||
1.1 | Ladigin TPP | Restoration of turbine hall control systems of Unit 3 | JSC Zahidenergo | 2023 |
1.2 | Kharkiv TPP-5 | Restoration of the turbine digital electro hydraulic regulation system | JSC Kharkiv TPP-5 | 2023 |
1.3 | Kharkiv TPP-5 | Restoration of the digital instrumentation system of the generator temperature monitoring No3 | JSC Kharkiv TPP-5 | 2023 |
1.4 | Dobrotvir TPP | Participation in the restoration of the instrumentation and control system of Unit No7 | JSC Ineterenergoservis | 2023 |
1.5 | Prydniprovska TPP | Modernization of the Unit 9 turbine governing system and boiler control system for purpose to withstand to ENTSO-E requirements | JSC Dniproenergo | 2022-2023 |
1.6 | Prydniprovska TPP | Plant control system development, manufacturing and installation | JSC Dniproenergo | 2022-2023 |
1.7 | Ladygyn TPP | Plant control system development, manufacturing and installation | JSC Zahidenergo | 2022-2023 |
1.8 | Ladygyn TPP | Modernization of the Unit 2 turbine governing system and boiler control system for purpose to withstand to ENTSO-E requirements | JSC Zahidenergo | 2022-2023 |
1.9 | Kharkiv TPP-5 | Adjusting the boilers regulation systems jf Units 1,2 3, for simultaneously firing of fuel gas and black oil | JSC Kharkiv TPP-5 | 2022 |
1.10 | Burshtin TPP | Modernization of the Unit 7 turbine governing system control system for purpose to withstand to ENTSO-E requirements | JSC Zahidenergo | 2022 |
1.11 |
Krivorizska TPP
|
Modernization of the Unit 1 Honeywell designed control system for stable regulation in whole power range and for purpose to withstand to ENTSO-E requirements | JSC Dniproenergo | 2022 |
1.12 | Zaporijia TPP | Modernization of the Unit 2 turbine governing system and boiler control system for purpose to withstand to ENTSO-E requirements | JSC Dniproenergo | 2021 |
1.13 | Zaporijia TPP | Modernization of the Unit 4 turbine governing system and boiler control system for purpose to withstand to ENTSO-E requirements | JSC Dniproenergo | 2020-2021 |
1.14 | Kiev TPP-5 | Development of the detailed design for reconstruction of Unit 3 control systems and turbine governing system for purpose to withstand to ENTSO-E requirements | Energyconsult | 2020 |
1.15 | Kiev TPP-6 | Development of the detailed design for reconstruction of Units 1, 2 control systems and turbine governing system for purpose to withstand to ENTSO-E requirements | Energyconsult | 2020 |
1.16 | Zaporijia TPP | Development and installation of microprocessors based data acquisition systems for performance monitoring of units 1, 2, 3, 4 | LLC Electronaladka | 2020 |
1.17 | PureCannabiSwiss AG, Swezaland | Manufacturing of 64 electrical cabinets for factory climatic control, CE certification | PureCannabiSwiss AG | 2020 |
1.18 | Moldovian TPP, Moldova |
Development of the project, development of software and commission of instrumentation and control systems of Units 11,12 on Mitsubushi controllers platform | Moldovian TPP | 2019-2021 |
1.19 | Kharkiv TPP-5 | Development, manufacturing and commissioning of boilers control systems of Units 1, 2 ,3 and turbine electrohydraulic governing system of Unit 2 | Kharkiv TPP-5 | 2018-2019 |
1.20 | Burshtin TPP | Development and installation of microprocessors based data acquisition systems for performance monitoring of units 3…12 | Zachidenergo | 2017-2019 |
1.21 | Moldovian TPP, Moldova |
Development, manufacturing, supply and commissioning of burners control and protection systems of Units 8,9,10 | Moldovian TPP | 2018 -2020 |
1.22 | Zmiiv TPP | Boiler control system modernization for combustion of other then boilers were designed type of coal of Units 2,5,6 | LLC Kotloturboprom | 2018-2019 |
1.23 | Moldovian TPP, Republica Moldova |
Development of the project of instrumentation and control system for units 11,12. | EMV technologies | 2018-2019 |
1.24 | Moldovian TPP, Republica Moldova |
Implementation of the project of boiler lighting protections and interlocks. | Energy-ORGRES, Bulgaria |
2018-2019 |
1.25 | Kharkiv TPP-5, Ukraine |
Development of the project of the feedwater pumps frequency regulating. | Kharkiv TPP-5 | 2018 |
1.26 | Kharkiv TPP-5, Ukraine |
Development of the project and commissioning of the turbine 2 microprocessor based remote control systems. | Kharkiv TPP-5 | 2018 |
1.27 | Pridneprov TPP, Ukraine |
Design and implementation coordinated control of boiler power regulator and new fuel coal preparatory control system. | Emerson | 2018 |
1.28 | Cherkasy TPP, Ukraine |
Development of the project of boilers 1…4 control systems. | Ukratomproject | 2018 |
1.29 | Pridneprov TPP, Ukraine |
Development, supply ,mounting and commission of the instrumentation and control systems for new equipment due to modernization of technological equipment. | Dniproenergo | 2018-2019 |
1.30 | Kharkiv TPP-5, Ukraine |
Development, design and implementation of the new Turbine digital electro-hydraulic system project based on TREI GmbH company platform for the power unit 100 MW No2 | LLC Ukrproectenergomontaj Ukraine | 2017 |
1.31 | Zmiyiv TPP, Ukraine | Development, design and implementation of the DCS project based on TREI GmbH company platform for calculation of technical and economic indicators and registration of emergency events at power units 200 MW No1-6 | Central Electricity Company, Ukraine |
2017 |
1.32 | Zmiyiv TPP, Ukraine | Development, design and implementation of the DCS project based on TREI GmbH company platform for new systems for the supply and combustion of gas-fired coal in the furnace of the boiler for the power units 200 MW No2, 5. | Central Electricity Company, Ukraine |
2017 |
1.33 | Moldovian TPP, Moldova |
Implementation of I&C systems project based on TREI GmbH company platform for the power unit 200 MW No 10 | Moldovian TPP, Moldova |
2017 |
1.34 | Kharkiv TPP-5, Ukraine |
Detail project development for reconstruction of turbine controllers, technological protection, protective inflammatory devices of a power unit No2 based on TREI GmbH company platform, and “Fireye” company platform. | LLC Ukrproectenergomontaj, Ukraine |
2016 |
1.35 | Burshtyn TPP, Zaporizhzhya TPP, Ukraine |
Development and implementation of the monitoring system project for the units 1-12 Burshtyn TPP, units 1-4, 6 Zaporizhzhya TPP.. | DTEC “Zahidenergo”, "Dniproenergo", Ukraine |
2016-2017 |
1.36 | Lviv TPP-1, Ukraine |
The development, design, assembly and supply of the equipment, installation and commissioning of boiler No7,6, microprocessors regulators based on Westron (Kharkiv, Ukraine) company platform. | Lvivteploenergo, Ukraine |
2016-2017 |
1.37 | Zaporizhzhya TPP, units №1,3; Ugliegorsk TPP, units №1,3,4; Kharkiv TPP-5, units №1,3; Trypillya TPP, unit №2, Ukraine |
Testing of power units to verify their primary and secondary regulation in accordance with ENTSO-E standards. | National Energy Company “Ukrenergo”, Chehpol, Ukraine |
2015 |
1.38 | Ugliegorsk TPP, Ukraine |
Development, design, assembling and delivery of controller cabinets, installation, and commissioning I&C systems of 300 MW coal fired power units №1, 3, 4, 2 based on TREI GmbH company platform. | Central electricity company | May-October 2013 (unit 1), November 2013 (unit 4), March 2014 (unit 3), September 2015 (unit 2) |
1.39 | Ladyzhin TPP, Ukraine |
The development and implementation of a complex computer simulator of 300MW power unit. | JSC “Zahidenergo” | 2013-2014 |
1.40 | Moldovian TPP, Ukraine |
Development reconstruction project of I&C system of a power unit № 10. | Moldovian TPP | 2013 |
1.41 | Moldovian TPP, Ukraine |
Development the project of the boiler monitoring system of power units №№ 9, 10, 11, 12. | Moldovian TPP | 2013 |
1.42 | Burshtyn TPP, Ukraine |
The development of detail project for reconstruction of I&C system of a power unit № 5 based on ABB company platform. | ABB | 2013 |
1.43 | Dobrotvir TPP, Ukraine |
The development of project documents and commissioning of I&C system of a power unit № 8 based on Emerson company platform. | Emerson | 2013 |
1.44 | Zaporizhzhya TPP, Ukraine |
Development, design, assembly and supply of equipment, installation and commissioning I&C system of 300 MW coal fired power unit №1 based on TREI GmbH company platform. | JSC “Dniproenergo” | 2011-2012 |
1.45 | Moldovian TPP, Moldova |
Development, design, assembly and supply of equipment, installation, and commissioning of digital control systems, DEH and protection systems of 200 MW gas fired power unit №9 based on TREI GmbH company platform. | Moldovian TPP | 2011 |
1.46 | Pridnieprovska TPP, Ukraine |
Development, design, assembly and supply of equipment, installation, and commissioning of digital control systems of 150 MW power unit №9 based on TREI platform. | JSC “Dniproenergo” | 2010-2012 |
1.47 | Burshtyn TPP, Ukraine |
The development and implementation of a complex computer simulator of 200MW power unit. | JSC “Zahidenergo” | 2010-2012 |
1.48 | Lugansk TPP, Ukraine |
The development and implementation of a complex computer simulator of 200MW power unit. | JSC “Vostokenergo” | 2010-2011 |
1.49 | Moldovian TPP, Moldova |
The development and implementation of a complex computer simulator of 200 MW power unit. | Moldovian TPP | 2010-2011 |
1.50 | National Energy Company “Ukrenergo” | The evaluation of power and frequency regulation state of UES of Ukraine. | National Energy Company “Ukrenergo” | 2010 |
1.51 | Kryvorizhska TPP, Ukraine |
Development, design, assembly and supply of equipment, installation, and commissioning of digital control systems, DEH and protection systems of 300 MW coal fired power unit №3 based on TREI GmbH company platform. | JSC “Dniproenergo” | 2009-2012 |
1.52 | Kurahovo TPP, Ukraine |
The development and implementation of a complex computer simulator of 200MW power unit for operators training. | JSC “Vostokenergo” | 2009-2010 |
1.53 | National Energy Company “Ukrenergo” | The development of draft for power and frequency regulation systems of the United Electricity System (UES) of Ukraine. |
National Energy Company “Ukrenergo” | 2009-2010 |
1.54 | Burshtyn TPP, Ukraine |
The development, design, assembly and supply of equipment, installation, and commissioning of I&C system of 200 MW power unit .№ 7 based on TREI platform. | JSC “Zahidenergo” | 2007-2010 |
1.55 | Moldovian TPP, Moldova |
Development, design, assembly and supply of equipment, installation, commissioning of boilers digital control systems for combined cycle power units №11, 12 based on TREI equipment. | Moldovian TPP | 2006-2008 |
1.56 | “South Baghdad’ TPP Iraq |
The development, installation, and commissioning of full-scale I&C systems (including turbine DEH systems) of two 50 MW power units based on a controller platform Vulkan M (“Westron”, Ukraine). | Inter-energoservice, Russia |
2006-2008 |
1.57 | Burshtyn TPP, Ukraine |
The development, design, assembly and supply of equipment, installation, and commissioning of I&C system (including DEH) of 200 MW power unit № 9 based on TREI platform. | JSC “Zayidenergo” | 2005-2006 |
1.58 | Minsk TPP-5, Byelorussia |
The software development, participation in hardware design, commissioning and maintenance assessment of a full scale microprocessor I&C system of 330 MW power unit № 1 based on MAUS platform (plant named after T. Shevchenko, Ukraine). | Minskenergo | 1999-2011 |
2. NPP Automation Systems | ||||
2.1 | Zaporojskaia NPP, Ukraine | Testing of the possibility of unit participation in grid primary frequency regulation | Energoatom | 2018 -2019 |
2.2 | NPP “Kozloduy”, Bulgaria | Development of technical solutions for improving operational modes of the 5,6 RY10 та 0,1,2 RY 30 systems of first loop water purification | NPP “Kozloduy” | 2017 |
2.3 | NPP “Kozloduy”, Bulgaria | Modernization of I&C system for the first loop water purification No3 NPP “Kozloduy” EAD | NPP “Kozloduy” | 2014-2017 |
2.4 | NPP “Kozloduy”, Bulgaria |
Functional design, plant model adaptation, an open and closed loop testing and implementation of heating and cooling-down system of new chamber type high-pressure heaters based on OVATION platform. | NPP “Kozloduy” | 2013-2017 |
2.5 | National nuclear Energy company “Energoatom”, Ukraine |
The investigation of a possibility of power plants PWR-440 and PWR-1000 participation in a primary frequency regulation. | National nuclear Energy company “Energoatom” | 2010 |
2.6 | National nuclear Energy company “Energoatom”, Ukraine |
The development of the conception of I&C systems of units 3, 4 at Khmelnitskaya NPP (together with Kharkiv Complex Automation Institute). | National nuclear Energy company “Energoatom” | 2010 |
2.7 | NPP “Kozloduy”, Bulgaria |
The verification in a closed loop with a plant model, and commissioning of safety systems regulators based on the equipment of ”Radiy” stock company. | “Radiy” stock company, Ukraine | 2008-2010 |
2.8 | Armenian NPP, Armenia |
The software development, verification in an open and closed loops, and commissioning of steam generators of feedwater regulation system based on “Vulkan” controllers platform (Westron, Ukraine). | Ltd. Westron, Ukraine (TACIS program) |
2006-2007 |
2.9 | South-Ukrainian NPP, unit. 3, Ukraine |
The software development, the verification in an open and closed loops, and commissioning of steam generators feedwater regulation system and turbodriven feedwater pumps productivity regulation system based on “Vulkan” controllers platform (Westron, Ukraine). | Ltd. Westron, Ukraine |
2006-2007 |
2.10 | South-Ukrainian NPP, units 1, 2, Ukraine |
The software development, the verification in open and closed loops and commissioning of safety systems regulators based on “Vulkan-M” controllers platform (Westron, Ukraine). | Ltd. Westron, Ukraine |
2006-2007 |
2.11 | South-Ukrainian NPP, Unit 1, Bulgaria |
The verification in a closed loop, and commissioning of the reactor power and reactor power limit regulator and reactor preliminary protection based on “Radiy” platform. | “Radiy” stock company, Ukraine |
2005 |
2.12 | NPP “Kozloduy”, bl. 5, 6, Bulgaria |
The verification in an open and closed loops (with a plant model), and commissioning of regulation systems of the first loop based on OVATION platform. | WESTINGHOUSE USA |
2004-2006 |
2.13 | Rivne NPP, unit 4, Ukraine |
The software development and commissioning of first, secondary loops and safety systems regulators based on M2002 controllers platform (manufacturer named after T. Shevchenko, Ukraine). | National nuclear Energy company “Energoatom” | 2003-2004 |
2.14 | Rivne NPP, unit 4, Ukraine |
The verification in a closed loop, and commissioning of the reactor power and reactor power limit regulator and reactor preliminary protection based on “Radiy” platform. | National nuclear Energy company “Energoatom” | 2003-2004 |
2.15 | Zaporizhzhya NPP, Ukraine |
The software development, software verification in an open and closed loops, commissioning of secondary loop control systems-ASUT-1000M and M2002 (Kharkov controllers manufacture, Ukraine). | National nuclear Energy company “Energoatom” | 2002-2008 |
2.16 | NPP “Kozloduy”, bl. 5, 6, Bulgaria |
Software functional design, the verification in an open and closed loops (with a plant model), and commissioning of the second loop regulation systems and digital electro –hydraulic system (DEH) based on OVATION platform. | WESTINGHOUSE USA |
2002-2005 |
2.17 | South-Ukrainian NPP, bl. 1,2, Ukraine |
Software functional design, the verification in an open and closed loops, and commissioning of steam generators feedwater regulation system and turbodriven feedwater pumps productivity regulation system based on WDPF platform. | WESTINGHOUSE ENERGY EUROPE (TACIS program) |
1999-2003 |