Certificate for the management system according to ДСТУ ISO 9001:2009 №UA2.171.09129-15

4th quarter 2021


1. An automatic general air control system with blast fan clutch on power unit № 2 of Kharkiv CHP-5 has been introduced
2. The expansion of the monitoring system at units 11 and 12 of Burshtyn TPP has been completed
3. Replacement of cable connections to the fittings of power units 1-4 of Zaporizhzhya TPP
News

4th quarter 2021

1. An automatic general air control system with blast fan clutch on power unit № 2 of Kharkiv CHP-5 has been introduced
2. The expansion of the monitoring system at units 11 and 12 of Burshtyn TPP has been completed
3. Replacement of cable connections to the fittings of power units 1-4 of Zaporizhzhya TPP