Certificate for the management system according to ДСТУ ISO 9001:2009 №UA2.171.09129-15
1. An automatic general air control system with blast fan clutch on power unit № 2 of Kharkiv CHP-5 has been introduced
2. The expansion of the monitoring system at units 11 and 12 of Burshtyn TPP has been completed
3. Replacement of cable connections to the fittings of power units 1-4 o...
1 Implementation of the power unit control system № 2 Zaporizhzhya TPP
2 Supply of equipment for monitoring systems of power units № 11 and 12 of Burshtyn TPP
3 Service of PTC CCM units № 9 Burshtyn TPP and Prydniprovska TPP
1 The project of SAR of the turbine of block № 7 of Burshtyn TPP is developed
2 Service of PTC CCM unit № 9 of Prydniprovska TPP was carried out
3 Supply of equipment for SARCHP units № 2 and №4 of Zaporizhzhya TPP
Projects have been developed: «Technical re-equipment of DTEK ZAPORIZHSKA TPP power unit control system №2» and «Technical re-equipment of DTEK ZAPORIZHSKA TPP power unit control system system №4»
1. Development of algorithms, technical and operational documentation and consultation in the part of the process control system of the 52 MW steam-gas power plant for ENERGY-ORGRES EOOD (Bulgaria)
2. Modernization of the control system when equipping unit №1 of Zaporizhzhya TPP with a pi...
1. Received a European certificate for the manufacture of electrical switchboard products.
2. Assembly and delivery of distribution cabinets and CB for PureCannabiSwiss AG.
1 Modernization the equipment of automatic regulation of power units №№1,2,3 Kharkiv TPP-5 in terms of transfer of new parameters according to the requirements of the Energy Market Rules.
2 Project works on technical re-equipment of ACS turbines and ACS frequency and power at Kyiv TPP-5 a...
1. Field equipment of the SME system of seven power units of Burshtyn TPP was installed
2. Developed and loaded into the controllers of the FS APCS for unit 11 of Moldova
3. Completed the commissioning of field equipment at the steam power plant of APCS unit №11 TPP of Moldova
Participation in the certification of SARPCH block number 1,2,3 of Kharkiv TPP-5
Submitted projects on the central power regulator block number 3 and expansion of monitoring of Burshtyn TPP
Started work documentation SKU bl.№7, Slavic TPP
Maintenance of PTK of block number 3 of Kharkiv TPP-5 was carried out
Training of DTEK Zaporizhzhia TPP Specialists on PTK of ACS TP block number 1
Maintenance of PTK of block number 2 of Kharkiv TPP-5 was carried out
The installation of the temperature control system of the generator at Unit 3 of Kharkiv TPP-5 has begun
Design work has begun on expanding the monitoring system of Burshtyn TPP units
Works on the project of digital RZHK at block number 3 of Burshtyn TPP
Service maintenance of the CCM at block number 8 of Pridneprovska TPP was carried out
Work has begun on the block number 1 Zaporizhzhya TPP for the transfer of TZH 1 from a third-party source
The management of the company passed examinations at the Ministry of Energy of Radiation and Nuclear Safety.
Work has begun on the system of temperature control of generator № 3 of Kharkiv TPP-5
Service maintenance of PTC CCM approx. №7,8,9 Pridneprovska TPP
The design of a digital boiler feed regulator has begun on the Blvd. No. 3 of Burshtinska TPP
The technical tests of SRT Bl.3 of Kharkiv TPP-5 were conducted according to the testing methodology of SE "NEC Ukrenergo"
LLC "EMV-ENERGO" has taken the association "Ukrteploelektrocentral"
Code of the technical decision on participation of electric blocks VVER-1000 in regulation of frequency and power is developed.
News
1. An automatic general air control system with blast fan clutch on power unit № 2 of Kharkiv CHP-5 has been introduced
2. The expansion of the monitoring system at units 11 and 12 of Burshtyn TPP has been completed
3. Replacement of cable connections to the fittings of power units 1-4 o...
1 Implementation of the power unit control system № 2 Zaporizhzhya TPP
2 Supply of equipment for monitoring systems of power units № 11 and 12 of Burshtyn TPP
3 Service of PTC CCM units № 9 Burshtyn TPP and Prydniprovska TPP
1 The project of SAR of the turbine of block № 7 of Burshtyn TPP is developed
2 Service of PTC CCM unit № 9 of Prydniprovska TPP was carried out
3 Supply of equipment for SARCHP units № 2 and №4 of Zaporizhzhya TPP